Process and costs

ADU process in Los Angeles: steps, permits and costs.

Five stages, each with an owner, a duration and a price logic. The answers owners ask before they call.

LIVING / KITCHENBEDROOMBATH [__] FT[__] FT DETACHED ADU · FLOOR PLAN · CONCEPTConcept drawing · real photo to come

The process

Five stages, one team.

  1. 01

    Feasibility check

    We review your address, zoning and the lot, and tell you plainly what is possible. [__ days]

    Duration: Free

    LIVING / KITCHENBEDROOMBATH [__] FT[__] FT DETACHED ADU · FLOOR PLAN · CONCEPT
  2. 02

    Design and budget

    Layout, scope, phases and a written price range, before you commit to construction.

    Duration: [__ weeks]

    EXISTING HOMENEW ADU4 FT4 FTSIDE LOT LINEREAR LOT LINESETBACK LINES: MAX 4 FT FOR A NEW ADU (CALIFORNIA)
  3. 03

    Permits

    We prepare and submit the package and answer plan-check comments.

    Duration: [__ weeks]

    LIVING / KITCHENBEDROOMBATH [__] FT[__] FT DETACHED ADU · FLOOR PLAN · CONCEPT
  4. 04

    Construction

    One site team, weekly updates, quality checks at key stages.

    Duration: [__ weeks]

    EXISTING HOMEFRAMING STAGE
  5. 05

    Inspection and handover

    Final inspection, documentation and keys.

    Duration: [__ weeks]

    EXISTING HOME4 FT4 FTNEW DETACHED ADU

Structure

How we keep a project under control.

  • Clear scope definition
  • Structured planning and coordination
  • Regulatory and technical alignment
  • Controlled execution
  • Continuous oversight
  • Transparent communication

Compliance & regulatory

Projects must align with local regulations, zoning and technical requirements. Ensuring compliance early avoids delays, redesigns and unnecessary risk.

  • Zoning and local regulations review
  • Permit and compliance considerations
  • Structural and technical constraints
  • Alignment with applicable standards

Documentation & transparency

Clear documentation and structured communication keep every party aligned and every decision informed.

Risk management & accountability

Risks are identified early and managed proactively, with clear responsibilities.

  • Identification of potential risks
  • Anticipation of constraints
  • Clear allocation of responsibilities
  • Continuous oversight and accountability

Standards, partners & oversight

We work with selected professionals and partners who meet defined standards; oversight keeps execution consistent with your objectives.

Financing program

Build now. Pay later.*

Most homeowners assume an ADU needs a large upfront budget. For projects that meet our criteria, StructBuilder covers the payments until end of 2028, so your ADU is built and working before your first payment is due.

Check if my project qualifies →Ask on WhatsApp

*For qualified California homeowners. Eligibility depends on your project and your property equity profile; terms are explained during your call.

  1. 1Your ADU gets builtDesign, permits and construction move forward without the upfront pressure.
  2. 2It starts workingRental income or family space, and added value for your property.
  3. 3Then payments beginFor qualified projects, up to 24 months after the build: covered until end of 2028.*

Cost guide

What drives the cost of an ADU.

Size and layout

Square footage and the number of bedrooms and baths.

ADU type

Detached, garage conversion or second story.

Site access

How materials and crews reach the backyard.

Utilities

Distance and capacity of water, sewer, power and gas.

Foundation and structure

Soil, slab condition, structural upgrades.

Finishes

Windows, cladding, kitchen and bath selections.

Price ranges

Garage conversion
from $[______]

[Typical range, what it includes, what it excludes.]

Detached ADU
from $[______]

[Typical range, what it includes, what it excludes.]

Second-story ADU
from $[______]

[Typical range, what it includes, what it excludes.]

Fill in real ranges. Ranges qualify leads and build trust; they do not replace a written quote.

Compliance

The state rules that shape your project.

Summary of California ADU law as published by the state housing department. Local rules in Los Angeles can add detail, so we verify each address.

California ADU rules at a glance
Side and rear setbackA city cannot require more than 4 feet for a new ADU.
Minimum size cities must allowLocal limits cannot go below 850 sq ft, or 1,000 sq ft for units with more than one bedroom.
Impact feesADUs under 750 sq ft and all JADUs are exempt. Larger ADUs are charged in proportion to the main home.
ParkingAt most one space per unit. None required for conversions of existing space, near transit, or in historic districts. No replacement parking when a garage is converted.
JADUUp to 500 sq ft, inside an existing or proposed single-family home. One per lot.

Source: California HCD, ADU Fact Sheet; Government Code §§ 66310–66342.

FAQ

Process questions, answered.

What happens during the feasibility check?

We review your address, zoning, lot size, utilities and any easements or hazard zones, then tell you which ADU types fit and what to expect next.

When do I get a price?

After the design stage you get a written price range based on your plans, before you commit to construction.

Who submits the permits?

StructBuilder prepares and submits the permit package, answers plan-check comments and schedules inspections.

What drives the cost the most?

Size, ADU type, site access, utility connections, foundation and finishes. The cost guide above explains each one.

Do state rules override local rules?

California ADU law sets limits cities cannot go beyond, such as the 4 ft setback cap. Local rules still apply within those limits, so each address is checked.

Find out what your lot can hold.

Send your address. We check zoning and site constraints and reply with a clear next step.

Check my property →Call (424) 448-4895
CallFree feasibility check